1962
More components of the nuclear power station wait to be unloaded from the USS Arneb.
In early November, 1961, the plant modules were loaded onto the USS Arneb in Rhode Island. On December 13, 1961, the ship arrived at McMurdo sound and began uloading on the ice.
© David Eldred
More nuclear components
All of the components of the nuclear plant were unloaded by December 29, 1961. The components were hauled over the ice on cargo sleds to the reactor site at McMurdo Station. Between January 1, and March 1, 1962 the plant was assembled and tested. On March 4, 1961 the plant was operational. Incredibly, the entire project had gone from Congressional approval to operation in 18 month - by today's standards, an amazing feat.
© David Eldred
Cargo sleds
Unfortunately, the nuclear power plant was not the answer to the station's needs that its proponents had hoped. The plant suffered several accidents and problems, from a fire in the containment tanks in fall 1962, to the coolant leak that sealed its fate in 1972. The plant was removed during the late 1970s.